PASSENGER ELEVATOR
Product Description
We can do both machine room and non-machine room passenger elevators
Passenger Elevator(MR)
The launch of Asia FUJI small computer room elevator has led the elevator industry to move toward small machine room equipment configuration. Small machine room elevator can meet both passenger and freight transportation; they are suitable for office, hotel, residential building and skyscraper.Asia FUJI small machine room elevator is driven by permanent magnet gearless traction machine to ensure safe and reliable operation, lower noise and better performance.
©Small machine room,space-saving,lower the cost,high efficiency
The use of small machine room elevator technology not only speeds up the construction progress and ensures the smooth operation of the construction project, but also easy to replace the traction machine when it needs to be modified, while the traditional drive system cannot meet such a convenient transformation.
Passenger Elevator(MRL)
With the advancement of science and technology,MRL elevator was created by Asia FUJI Elevator,which was added to the interior without destroying the original appearance of ancient buildings. This technology has achieved permanent magnet gearless traction
MRL elevator after several trials and experime
Product Parameters
Small machine room passenger elevator parameters
Capacity (Kg) |
Person |
Speed (m/s) |
Entrance(mm) |
Clear car dimension (mm) |
Caroutstide dimension (mm) |
Clear hoistway dimension (mm) |
Machine room dimension (mm) |
Pit depth (mm) |
Overhead Height (mm) |
Pit reaction load (KN)
|
Machine room reaction load(KN) |
Rated power (KW) |
Power supply capacity |
Lead-in wire |
Q |
NO. |
V |
OP |
CWXCD |
SWXSD |
HWXHD |
MWXMDXMH |
PD |
OH |
R1 |
R2 |
R3 |
R4 |
KW |
KVA |
MM2 |
450 |
6 |
1.0 |
700 |
1200x1100 |
1252x1266 |
1800x1800 |
1800x1800x2200 |
1500 |
4400 |
50 |
40 |
20 |
8 |
3 |
3.6 |
4 |
1.5 |
1600 |
4500 |
4.8 |
5.8 |
4 |
630 |
8 |
1.0 |
800 |
1400x1100 |
1452x1266 |
2000x1800 |
2000x1800x2200 |
1500 |
4400 |
68 |
54 |
24 |
10 |
4.3 |
5.2 |
4 |
1.5 |
1600 |
4500 |
6.8 |
8.2 |
6 |
800 |
10 |
1.0 |
800 |
1400x1350 |
1452x1516 |
2000x2050 |
2000x2050x2200 |
1500 |
4400 |
76 |
60 |
28 |
12 |
5.4 |
6.5 |
6 |
1.5 |
1600 |
4500 |
8.6 |
10.3 |
6 |
1.75 |
1700 |
4600 |
9.6 |
11.5 |
6 |
2.0 |
1800 |
4700 |
11 |
13.2 |
6 |
1000 |
13 |
1.0 |
900 |
1600x1450 |
1652x1616 |
2200x2200 |
2200x2200x2200 |
1500 |
4400 |
90 |
72 |
32 |
15 |
6.4 |
7.7 |
6 |
1.5 |
1600 |
4500 |
10.7 |
12.8 |
6 |
1.75 |
1700 |
4600 |
11.7 |
14 |
6 |
2.0 |
1800 |
4700 |
13.4 |
16.1 |
10 |
2.5 |
2000 |
4900 |
17 |
20.4 |
10 |
4.0 |
3800 |
5900 |
27.7 |
31.5 |
10 |
1250 |
16 |
1.0 |
1000 |
1800x1550 |
1852x1716 |
2400x2300 |
2400x2300x2200 |
1500 |
4400 |
105 |
80 |
36 |
18 |
8.5 |
10.2 |
6 |
1.5 |
1600 |
4500 |
13.5 |
6.2 |
10 |
1.75 |
1700 |
4600 |
14.8 |
7.8 |
10 |
2.0 |
1800 |
4700 |
17 |
20.4 |
10 |
2.5 |
2000 |
4900 |
22 |
26.4 |
10 |
4.0 |
3800 |
5900 |
34.6 |
39.6 |
10 |
1350 |
18 |
1.0 |
1100 |
1900x1600 |
1952x1766 |
2500x2300 |
2500x2300x2200 |
1500 |
4400 |
115 |
90 |
40 |
20 |
9.3 |
11.2 |
6 |
1.5 |
1600 |
4500 |
14.9 |
17.9 |
10 |
1.75 |
1700 |
4600 |
16.3 |
19.6 |
10 |
2.0 |
1800 |
4700 |
18.7 |
22.4 |
10 |
2.5 |
2000 |
4900 |
23.4 |
28.1 |
10 |
4.0 |
3800 |
5900 |
36.8 |
44.2 |
10 |
1600 |
21 |
1.0 |
1200 |
2000x1700 |
2052x1866 |
2600x2400 |
2600x2400x2200 |
1500 |
4400 |
136 |
105 |
48 |
26 |
11 |
13.2 |
6 |
1.5 |
1600 |
4500 |
17.5 |
21 |
10 |
1.75 |
1700 |
4600 |
19 |
22.8 |
10 |
2.0 |
1800 |
4700 |
22 |
26.4 |
10 |
2.5 |
2000 |
4900 |
27.5 |
33 |
10 |
4.0 |
3800 |
5900 |
34.2 |
41 |
10 |
Machine room less passenger elevator parameter
Capacity (Kg) |
Person |
Speed (m/s) |
Entrance(mm) |
Clear car dimension (mm) |
Car outside dimension (mm) |
Clear hoistway dimension (mm) |
Pit depth (mm) |
Overhead Height (mm) |
Pit reaction load (KN)
|
Load-supporting beam reaction load (KN) |
Rated power (KW) |
Power supply capacity |
Lead-in wire |
Q |
NO. |
V |
OP |
CWXCD |
SWXSD |
HWXHD |
PD |
OH |
R1 |
R2 |
R3 |
R4 |
KW |
KVA |
MM2 |
630 |
8 |
1.0 |
700 |
1200X1300 |
1252X1466 |
2000X1900 |
1500 |
4000 |
68 |
54 |
24 |
10 |
4.3 |
5.2 |
4 |
1.6 |
1600 |
4200 |
6.8 |
8.2 |
6 |
800 |
10 |
1.0 |
800 |
1300X1450 |
1352X1616 |
2100X2000 |
1500 |
4000 |
76 |
60 |
28 |
12 |
5.4 |
6.5 |
6 |
1.6 |
1600 |
4200 |
8.6 |
10.3 |
6 |
1.75 |
1700 |
4300 |
9.6 |
11.5 |
6 |
2.0 |
1800 |
4400 |
11 |
13.2 |
6 |
1000 |
13 |
1.0 |
900 |
1450X1600 |
1502X1766 |
2300X2000 |
1500 |
4000 |
90 |
72 |
32 |
15 |
6.4 |
7.7 |
6 |
1.6 |
1600 |
4200 |
10.7 |
12.8 |
6 |
1.75 |
1700 |
4300 |
11.7 |
14 |
6 |
2.0 |
1800 |
4400 |
13.4 |
16.1 |
10 |
2.5 |
2000 |
4500 |
17 |
20.4 |
10 |
1250 |
16 |
1.0 |
1000 |
1800X1550 |
1852X1716 |
2600X2050 |
1500 |
4200 |
105 |
80 |
36 |
18 |
8.5 |
10.2 |
6 |
1.6 |
1600 |
4300 |
13.5 |
16.2 |
10 |
1.75 |
1700 |
4400 |
14.8 |
17.8 |
10 |
2.0 |
1800 |
4500 |
17 |
20.4 |
10 |
2.5 |
2000 |
4600 |
22 |
26.4 |
10 |
1350 |
18 |
1.0 |
1100 |
1900X1600 |
1952X1766 |
2700X2050 |
1500 |
4200 |
115 |
90 |
40 |
20 |
9.3 |
11.2 |
6 |
1.6 |
1600 |
4300 |
14.9 |
17.9 |
10 |
1.75 |
1700 |
4400 |
16.3 |
19.6 |
10 |
2.0 |
1800 |
4500 |
18.7 |
22.4 |
10 |
2.5 |
2000 |
4600 |
23.4 |
28.1 |
10 |
1600 |
21 |
1.0 |
1200 |
2000X1700 |
2052X1866 |
2900X2150 |
1500 |
4200 |
136 |
105 |
48 |
26 |
11 |
13.2 |
6 |
1.6 |
1600 |
4300 |
17.5 |
21 |
10 |
1.75 |
1700 |
4400 |
19 |
22.8 |
10 |
2.0 |
1800 |
4600 |
22 |
26.4 |
10 |
2.5 |
2000 |
4800 |
27.5 |
33 |
10 |
Cabin design style
Project Showcase
Geographical Advantages and Strong Technical Power
Our Advantages
HIGH-END INTELLIGENT CONTROL SYSTEM
Asia FUJI Elevator adopts VLSI and microcomputer control system has greatly reduced the size of the control cabinet, which can be achieved by using only a small type of control cabinet regardless of the floor level.
The 32-bit digital parallel central processing unit is used to process digital signals and magnetic flux vector calculations of the motor at high speeds in various operating speeds of Fuji Elevator Asia.
It has a torque bias function to compensate for load changes,
a digital automatic speed regulator ASR system, and Fuji's unique speed detection circuit to achieve the world's highest level of high-precision speed control (accuracy is 0.01% of the highest speed , The resolution is 0.005% of the highest speed of soil),the latest online tuning technology of Fuji Asia has the
function of automatically compensating the rated parameters according to temperature changes.
Therefore, the elevator is used to ensure high-precision and high-reliability control in the environment of long-term operation and temperature fluctuations.
Using dual 32-bit parallel central processing units for high-speed processing, FUJI most advanced dual closed-loop (distance closed-loop, speed closed-loop) system ensures that the highest and lowest speeds (minimum speed of 5 rpm) can achieve High precision and fast response control.At the same time,it has four-quadrant operation and feedback function.According to the elevator running direction and passenger weight (how many people),it can covert the weight into an electric signal and feed it back to the central parallel processing unit for calculation and control the motor to output the most reasonable torque,best comfort running effect.
MINIATURE ENERGY-SAVING HOST SYSTEM
The latest permanent magnet gearless tractor was used to replace the traditional worm gear traction machine,which realizing the ultra small size,light weight of the traction machine, also eliminating the mechanical consumption between gears.
It can save energy by more than 60% compared with the previous elevator technology, and meet the environmental protection requirements of minimum vibration, minimum machine room, no need for oil, maintenance-free with minimum noise,
It is a major technological breakthrough for AC elevator that the high-speed operation of FUJI Elevator. With distribution and data comparison device, which automatically adjusts according to the flow of people to make the elevator run evenly and comfortably, further improving the elevator's operating efficiency.
Most elevator manufacturers generally use energy-consuming braking to dissipate energy in resistors.FUJI Elevator drag system with a regenerative braking unit (regenerative braking),has the ability to transfer energy in four-quadrant operation and feedback to the grid. Therefore, it can save energy by 50% compared to ordinary AC elevator and 20% than ordinary FM elevator, which greatly reduces the operating cost of elevators.
©VVVF FM control system&High technology
FUJI Elevator uses a low-noise vector-controlled inverter to regulate frequency, voltage, and speed (VVVF), which is an important symbol of high-performance elevator today. At the same time, the world's most advanced IGBT is used to enable the inverter to achieve high-frequency PWM control, which greatly reduces the noise of the motor,power consumption, and extends the life of the motor directly.
Company Profile
INTRODUCTION OF ASIA FUJI ELEVATOR
Asia FUJI Elevator (Linyi) Co., Ltd. is a joint-stock enterprise that integrates the research and development, design, production, sales and installation and maintenance of various elevators,located in Pingyi County, Linyi City, Shandong Province,which has a total area of 300 acres and a total investment of 1.3 billion yuan is a key investment attraction of Linyi City in 2015. At present, the company has obtained honors like the "National Quality Inspection Stable and Qualified Products", "National Quality and Honest Outstanding Enterprise" honor certificate and "High-tech Enterprise" and has won 11 patents in the elevator industry.
The test tower, which integrates elevator and stereo garage inspection and testing, is 159 meters high,speed up to 10m / s, and the intelligent stereo garage is 109 meters high. No. 1 test tower in North China.
Facing the new normal of the economy, Asia FUJI Elevator will develop towards high-end, intelligent, and Internet of Things.Facilitate elevators and intelligent
three-dimensional garages to upgrade their equipment, advance the manufacturing industry to cutting-edges, and quickly achieve the grand goal of "based on China, facing Asia, and going global"! In the next 5-10 years, Asia FUJI Elevator will respond to the national "One Belt and One Road" policy,take Shandong as the base, Beijing, Shanghai, Jinan, and Shenzhen as the window, and set up branches overseas and establish prodcution bases in Southeast Asia. gradually make products to the world to achieve rapid development.
Building the leader of elevator industry
1.Interpretation of production integration
Our production commitment advanced technology,reliable quality, excellent service reasonable price
2.Maintenance is life, training is survival.
Excellent technical maintenance is an indispensable guarantee for safe and comfortable operation of elevators, escalators and sidewalks. Even if the
essence of modern technology is collected, durable and durable lift lift can not prevent wear and aging. For this reason, mechanical equipment is always kept in the best condition, and maintenance of the cause for troubleshooting and accidents is essential
3.Each project has a separate professional maintenance project team
FUJI Elevator in Asia adopts individual response and meticulous and
thoughtful security services for each elevator's use. Even a small screw can't nerane cfrint inerertian
Packaging & Shipping
FAQ
Q1.Why choose us?
A:Asia Fuji Elevator is a joint-stock enterprise integrating elevator R & D, design, production, sales,
installation and maintenance. Famous brand, already be confirmed by many customers Domestic and overseas Sample projects are customers voice for our quality.
Q2. What information is absolutely needed before asking for price?
A:1. How many persons? ( 6 persons for 450kg,8 persons for 630kg, 10 persons for 800kg etc..)
2. How many floors/ stops/ doors?
3. What's the shaft size? (width by depth)
4. Is there a machine room on the top of shaft?
Q3. How can we guarantee the good quality of your products?
A:In during the production process we will inspect all purchased and produced parts and take a record after put in crates, before shipping out we will do the final inspection and mock up the cabin and sling set, this part take photo and video as record to make customer being at ease.
Q4: What's the payment term?
A:30% in advance, 70% after customers inspection, before loading
Q5. What about the packaging?
A:All elevator parts will be packed into solid wooden cases. Some parts will be wrapped by the film so that guarantee the machinery part not be destroyed after long time transportation.
Q6. How to do with the elevator installation and maintenance?
A: We can send engineers to guide the installation and then train the workers about maintenance in the future. But in most situations, local workers can finish this work with our guidebooks and technology support, or you can ask the local professional elevator engineers to do this job, This can save much money for our customer. Of course, you can get support from our factory at any time.
Q7 . What's your guarantee time?
A:We can provide 18 months guarantee period, during this time, we will send free replacements to you. our service has no time limit.