Professional Design Safe Speed Passenger Sightseeing Elevator
New elevators using FM gating, intelligent remote monitoring, mainframe energy saving, low-noise and durable control cabinets, and environmentally friendly composite steel belts have gathered the latest scientific research achievements of humans in the fields of machinery, electronics, and optics. Out of the glory of humanity.
Facing the new normal of the economy, Asia FUJI Elevator will develop towards high-end, intelligent, and Internet of Things. Facilitate elevators and intelligent three-dimensional garages to upgrade their equipment, advance the manufacturing industry to cutting-edges, and quickly achieve the grand goal of "based on China, facing Asia, and going global"! In the next 5-10 years.
Asia FUJI Elevator will respond to the national "One Belt and One Road" policy,take Shandong as the base, Beijing, Shanghai, Jinan, and Shenzhen as the window, and set up branches overseas and establish prodcution bases in Southeast Asia.
gradually make products to the world to achieve rapid development.
Small machine-room Sightseeing elevator parameters
Capacity (Kg) |
Person |
Speed (m/s) |
Entrance(mm) |
Clear car dimension (mm) |
Caroutstide dimension (mm) |
Clear hoistway dimension (mm) |
Machine room dimension (mm) |
Pit depth (mm) |
Overhead Height (mm) |
Pit reaction load (KN)
|
Machine room reaction load(KN) |
Rated power (KW)
|
Power supply capacity |
Lead-in wire |
Q |
NO. |
V |
OP |
CWXCD |
SWXSD |
HWXHD |
MWXMDXMH |
PD |
OH |
R1 |
R2 |
R3 |
R4 |
KW |
KVA |
MM2 |
800 |
10 |
1.0 |
700 |
1250X1600 |
1302X1788 |
2400X2080 |
2400X2080X2500 |
1950 |
4400 |
80 |
64 |
30 |
12 |
5.4 |
6.5 |
6 |
|
|
1.6 |
|
|
|
|
|
2000 |
4550 |
|
|
|
|
8.6 |
10.3 |
6 |
|
|
1.75 |
|
|
|
|
|
2050 |
4600 |
|
|
|
|
9.6 |
11.5 |
6 |
|
|
2.0 |
|
|
|
|
|
2100 |
4600 |
|
|
|
|
11 |
13.2 |
6 |
1000 |
13 |
1.0 |
800 |
1350X1850 |
1402X2038 |
2500X2330 |
2500X2330X2500 |
1950 |
4400 |
96 |
78 |
34 |
15 |
6.4 |
7.7 |
6 |
|
|
1.6 |
|
|
|
|
|
2000 |
4550 |
|
|
|
|
10.7 |
12.8 |
6 |
|
|
1.75 |
|
|
|
|
|
2050 |
4600 |
|
|
|
|
11.7 |
14 |
6 |
|
|
2.0 |
|
|
|
|
|
2100 |
4600 |
|
|
|
|
13.7 |
16.1 |
10 |
1250 |
16 |
1.0 |
900 |
1500X1950 |
1552X2138 |
2650X2430 |
2650X2430X2500 |
1950 |
4400 |
114 |
84 |
38 |
18 |
8.5 |
10.2 |
6 |
|
|
1.6 |
|
|
|
|
|
2000 |
4550 |
|
|
|
|
13.5 |
16.2 |
10 |
|
|
1.75 |
|
|
|
|
|
2050 |
4600 |
|
|
|
|
14.8 |
17.8 |
10 |
|
|
2.0 |
|
|
|
|
|
2100 |
4600 |
|
|
|
|
17 |
20.4 |
10 |
1350 |
18 |
1.0 |
1000 |
1600X1950 |
1652X2138 |
2750X2430 |
2750X2430X2500 |
1950 |
4400 |
126 |
96 |
42 |
20 |
9.3 |
11.2 |
6 |
|
|
1.6 |
|
|
|
|
|
2000 |
4550 |
|
|
|
|
14.9 |
17.9 |
10 |
|
|
1.75 |
|
|
|
|
|
2050 |
4600 |
|
|
|
|
16.3 |
19.6 |
10 |
|
|
2.0 |
|
|
|
|
|
2100 |
4600 |
|
|
|
|
18.7 |
22.4 |
10 |
1600 |
21 |
1.0 |
1100 |
1700X1950 |
1752X2138 |
2900X2430 |
2900X2430X2500 |
1950 |
4400 |
136 |
105 |
48 |
26 |
11 |
13.2 |
6 |
|
|
1.6 |
|
|
|
|
|
2000 |
4550 |
|
|
|
|
17.5 |
21 |
10 |
|
|
1.75 |
|
|
|
|
|
2050 |
4600 |
|
|
|
|
19 |
22.8 |
10 |
|
|
2.0 |
|
|
|
|
|
2100 |
4600 |
|
|
|
|
22 |
26.4 |
10 |
Machine room less round or diamond sightseeing elevator parameters
Capacity (Kg) |
Person |
Speed (m/s) |
Entrance (mm) |
Clear car dimension (mm) |
Car outside dimension (mm) |
Clear hoistway dimension (mm) |
Pit depth (mm) |
Overhead Height (mm) |
Pit reaction load (KN)
|
Load-supporting beam reaction load (KN) |
Rated power (KW)
|
Power supply capacity |
Lead-in wire |
Q |
NO. |
V |
OP |
CWXCD |
SWXSD |
HWXHD |
PD |
OH |
R1 |
R2 |
R3 |
R4 |
KW |
KVA |
MM2 |
800 |
10 |
1.0 |
700 |
1250X1600 |
1302X1788 |
2400X2080 |
1950 |
4400 |
76 |
60 |
28 |
12 |
5.4 |
6.5 |
6 |
|
|
1.6 |
|
|
|
|
2000 |
4550 |
|
|
|
|
8.6 |
10.3 |
6 |
|
|
1.75 |
|
|
|
|
2050 |
4600 |
|
|
|
|
9.6 |
11.5 |
6 |
|
|
2.0 |
|
|
|
|
2100 |
4600 |
|
|
|
|
11 |
13.2 |
6 |
1000 |
13 |
1.0 |
800 |
1350X1850 |
1402X2038 |
2500X2330 |
1950 |
4400 |
90 |
72 |
32 |
15 |
6.4 |
7.7 |
6 |
|
|
1.6 |
|
|
|
|
2000 |
4550 |
|
|
|
|
10.7 |
12.8 |
6 |
|
|
1.75 |
|
|
|
|
2050 |
4600 |
|
|
|
|
11.7 |
14 |
6 |
|
|
2.0 |
|
|
|
|
2100 |
4600 |
|
|
|
|
13.4 |
16.1 |
10 |
1250 |
16 |
1.0 |
900 |
1500X1950 |
1552X2138 |
2650X2430 |
1950 |
4400 |
105 |
80 |
36 |
18 |
8.5 |
10.2 |
6 |
|
|
1.6 |
|
|
|
|
2000 |
4550 |
|
|
|
|
13.5 |
16.2 |
10 |
|
|
1.75 |
|
|
|
|
2050 |
4600 |
|
|
|
|
14.8 |
17.8 |
10 |
|
|
2.0 |
|
|
|
|
2100 |
4600 |
|
|
|
|
17 |
20.4 |
10 |
1350 |
18 |
1.0 |
1000 |
1600X1950 |
1652X2138 |
2750X2430 |
1950 |
4400 |
115 |
90 |
40 |
20 |
9.3 |
11.2 |
6 |
|
|
1.6 |
|
|
|
|
2000 |
4550 |
|
|
|
|
14.9 |
17.9 |
10 |
|
|
1.75 |
|
|
|
|
2050 |
4600 |
|
|
|
|
16.3 |
19.6 |
10 |
|
|
2.0 |
|
|
|
|
2100 |
4600 |
|
|
|
|
18.7 |
22.4 |
10 |
1600 |
21 |
1.0 |
1100 |
1700X1950 |
1752X2138 |
2900X2430 |
1950 |
4400 |
136 |
105 |
48 |
26 |
11 |
13.2 |
6 |
|
|
1.6 |
|
|
|
|
2000 |
4550 |
|
|
|
|
17.5 |
21 |
10 |
|
|
1.75 |
|
|
|
|
2050 |
4600 |
|
|
|
|
19 |
22.8 |
10 |
|
|
2.0 |
|
|
|
|
2100 |
4600 |
|
|
|
|
22 |
26.4 |
10 |
1.Safety&Reliability
Asia FUJI elevator put passengers safety at first,the elevator networking is incorporated into the Internet platform,all information of the elevator can be querried,maintained and managed.
2.Cost Reduction
At present, most elevator manufacturers are generally uses the braking energy, the energy consumption on the resistance, FUJI elevator drive system adopts regenerative braking units, the elevator can run in four quadrant of the energy feedback to the power grid so brings 50% energy-saving than ordinary AC elevator,20% than the ordinary elevator, greatly reduces the operating costs of the lift.
3.Environmental-Friendly
FUJI elevator uses the latest permanent magnet gearless to
replace the traditional turbo worm tractor, realizing the miniaturization of the tractor, light weight, small size, eliminating the mechanical consumption between the gears, and achieving the environmental requirements of no oil, no maintenance, minimum noise, minimum engine room.
4.High Technology
FUJI elevator adopts VVVF technology,and also uses IGBT,which is the most advanced transistor in the world,the noise of the motor is greatly reduced and the service life of the motor is prolonged.
5.Freely Custom made
Customers can choose their favorite and customized apperance for their own elevators from aspects of car finish, design, ceiling and floor materials.
Asia FUJI Elevator (Linyi) Co., Ltd. is a joint-stock enterprise that integrates the research and development, design, production, sales and installation and maintenance of various elevators,located in Pingyi County, Linyi City, Shandong Province,which has a total area of 300 acres and a total investment of 1.3 billion yuan is a key investment attraction of Linyi City in 2015. At present, the company has obtained honors like the "National Quality Inspection Stable and Qualified Products", "National Quality and Honest Outstanding Enterprise" honor certificate and "High-tech Enterprise" and has won 11 patents in the elevator industry.
We mainly produce passenger elevators, cargo elevators, sightseeing elevators, medical elevators, villa elevators, car elevators, escalators, automatic pedestrian ways, sundry elevators, three-dimensional garages, and other products.
Our company is mainly engaged in the export business of various elevators. We have more than 20 years of production and export experience in the elevator industry. So in the elevator field, both our technology and our services are very professional. You are maybe aware of the "One Belt One Road" policy strongly advocated by the Chinese state. Our engineers are the core engineer of the "One Belt One Road" project. We have been supplying these countries. If we are not professional enough, it is impossible to undertake the recognition of this project.
System packing method
1.We have a detailed packing list, which will help customers be clear about each container.
2.The elevator is delivered to the customer, the loading method is essential because it allows the installation team to perform the installation efficiently.
When loading goods, the order of loading is one system and one system, and then the packing list is placed on the container. When customers get the container, they can know exactly what is loaded into the container and when packing we have to go through three inspections and careful classification, each box opened can be installed in eighty percent of the main area to be installed, and will not have to open all the boxes to install other manufacturers. This facilitates on-site installation and management, greatly reducing the difficulty of installation and improving efficiency.
Q1.Why choose us?
A1:1.Professional technology with 23 years experiences to assure the latest elevator technology usageOur R&D engineers are awarded with national
2.technical awards by government "One Belt, One Roud " which has approved their professionalism in this field
3.The fully standard automatic production workshop can assure the precise production and high-end quality
4.Has exported elevators to over 56 countries including UAE, Africa, Australia, Brazil, USA, European, etc.
5.Listed company with over 23 years experiences in this field, and has its own professional R&D center which can innovate the latest technology for customers'the real and urgent needs.
Q2: What advantages do you have?
A2:1.National Awarded engineers in R&D and Quality Control department can guarantee that we're able to offer the high quality elevator
2.Main components of elevators are using imported highly quality-approved brands
3.Professional customization to meet your real demands
4.Latest technical innovations: healthy and Anti-epidemic function, additional safety-control
5.Professional, Systematic and timely Service Team
Q3. What information is absolutely needed before asking for price?
A3: 1. How many persons?
( 6 persons for 450kg,8 persons for 630kg, 10 persons for 800kg etc..)
2. How many floors/ stops/ doors?
3. What's the shaft size? (width by depth)
4. Is there a machine room on the top of shaft?
Q4. How can we guarantee the good quality of your products?
A4 : In during the production process we will inspect all purchased and produced parts and take a record after put in crates, before shipping out we will do the final inspection and mockup the cabin and sling set, this part take photo and video as record to make customer being at ease.
Q5: Whats the payment term?
A5: 1. Normally it shall be 30% of the total amount by T/T in advance before production, the balance payment of 70% shall be paid by T/T before shipment. Special terms should be in further discussion.
2.The delivery time is valid from the arrangement of 30% deposit and stamped and signed shaft layout drawing by both parties.
Q6. What about the packaging?
A6: All elevator parts will be packed into solid wooden cases. Some parts will be wrapped by the film so that guarantee the machinery part not be destroyed after long time transportation.
Q7. How to do with the elevator installation and maintenance?
A7: We have several professional team working for on-site installation locally in Ethiopia, Kenya, United Arab Emirates, etc, if you need on-site installation, we can send engineers to guide the installation and then train the workers about maintenance in the future. But in most situations, local workers can finish this work with our guidebooks and technology support, or you can ask the local professional elevator engineers to do this job, This can save much money for our customer. Of course, you can get support from our factory at any time.
Q8 . What's your guarantee time?
A8; We can provide 18months guarantee period, during this time, we will send free replacements to you. our service has no time limit.
Choose us and you won't regret!!!