Capacity
(Kg) |
Person |
Speed
(m/s) |
Entrance Clear car dimension (mm) |
Clear hoistway dimension (mm) |
Pit depth
(mm) |
Overhead height
(Mm) |
Rated power
(Kw) |
Power supply capacity |
Lead-in Wire |
Q |
NO. |
V |
CWXCD |
HWXHD |
PD |
OH |
KW |
KVA |
MM2 |
260 |
3 |
0.4 |
900X800 |
1600X1200 |
400 |
3000 |
1 |
2.5 |
4 |
1.0 |
1000 |
3200 |
2 |
5.2 |
6 |
320 |
4 |
0.4 |
900X1000 |
1600X1400 |
400 |
3000 |
1 |
2.5 |
6 |
1.0 |
1000 |
3200 |
2 |
5.2 |
6 |
400 |
5 |
0.4 |
1000x1000 |
1700x1500 |
400 |
3000 |
1 |
2.5 |
6 |
1.0 |
1000 |
3200 |
2.2 |
5.2 |
6 |
Safety Components
The safety control system which requires low environmental conditions, small size, light weight, uses advanced network control technology, and has a self-diagnostic function, not only has high stability and strong anti-corrosion ability, also making maintenance easier. Under the control of the system, the failure rate of the elevator is greatly reduced, which not only operates reliably, but also saves energy , and with a complete brake control component (speed limiter, safety gear, guide shoes, bumper, tensioner) to ensure The long-term normal operation and safety protection function of the safety control system are provided. |
Permanent Magnet Synchronous Maste
The latest permanent magnet gearless tractor was used to replace the traditional worm gear traction machine,which realizing the ultra small size,light weight of the traction machine, also eliminating the mechanical consumption between gears. It can save energy by more than 60% compared with the previous elevator technology, and meet the environmental protection requirements of minimum vibration, minimum machine room, no need for oil, maintenance-free with minimum noise.
|
1946
FUJI brand is established in 1946 and being popular brand worldwide till now.
2005~2015
Set up branch companies nationwide during 2005~2015
200,000
A joint-stock enterprise that integrates the research and development, design, production, sales and installation and maintenance of various elevators, located in Pingyi County, Linyi City, Shandong Province, with a total area of 200,000 square meters
2015
Set up the second production base in Linyi, Shandong
1.3 billion
We has totally investmented about 1.3 billion RMB in new production base, which is a key investment project of Linyi City in 2005.
20
At present, the company has obtained honors like the "National Quality Inspection Stable and Qualified Products", "National Quality and Honest Outstanding Enterprise" and "High-tech Enterprise" and has won 20 patents in the elevator industry.
159 + 10
The test tower, which integrates elevator and stereo garage inspection and testing, is 159 meters high, speed up to 10m/s.
Factory Technique Advance |
The company has established an effective management system in marketing, manufacturing transformation, installation, maintenance and construction, quality control, after-sales service, etc., and various related testing instruments, manufacturing and construction equipment and process equipment are fully equipped, which are in line with elevator manufacturing and installation to increase the production accuracy quality and production efficiency.
For example:
1. Full Automatic Precision Machine Line: Welding, Shearing, Bending, Turret Punching, Fiber Laser Cutting
2. ABB Robotic Production line: help increase the production precision for stable quality and high-efficiency.
National Certification And Licenses |
We fully understand your concerns about elevator quality, for such special traveling equipment, quality is the most important fact or since Life is Priceless.
We are in this industry as manufacturer for over 23 years, and have obtained over 20 professional patents and certificates, such as CE certificate, SGS, ISO, and Typing Test Reports for core components. Based on our reliable quality, we have done a lot of government projects, such as high-speed railway stations, underground stations, hospital elevator projects, etc.
As you know, in China, only the good quality elevator with professional services could win the government projects.
After-Sales Service System |
1. Pre-Installation Documents Preparation
We offer detailed Packing List, Elevator Maintenance Instruction, List of Construction Equipment & Tools, Elevator Installation List, etc.
2. Online Support For Installation
Our engineers have more than 20 years of elevator experience and in well English speaking as well, so you don't need to worry about the elevators installation, we will provide the most professional technical guidance and the most attentive installation service to ensure that all elevators can be operated properly, and be recognized by the customer and obtain more opportunities for cooperation.
3. Systematic On-site Installation Support
We have several professional team working for on-site installation locally in Ethiopia, Kenya, United Arab Emirates, etc, if you need on-site installation, we could send our team to your place to do installation work and train your operators for future maintenance.
4. 24 hours Online Service
24H * 7 days Online Service Support, without festival limitation, to guarantee the timely and effectively service to our customers.
Systematic & Modular Packaging:
The elevator is delivered to the customer, the loading method is important because it allows the installation team to perform the installation efficiently.
Q1.Why choose us?
A:Asia Fuji Elevator is a joint-stock enterprise integrating elevator R & D, design, production, sales,
installation and maintenance. Famous brand, already be confirmed by many customers Domestic and overseas Sample projects are customers voice for our quality.
Q2. What information is absolutely needed before asking for price?
A:1. How many persons? ( 6 persons for 450kg,8 persons for 630kg, 10 persons for 800kg etc..)
2. How many floors/ stops/ doors?
3. What's the shaft size? (width by depth)
4. Is there a machine room on the top of shaft?
Q3. How can we guarantee the quality of our elevators?
A:In during the production process we will inspect all purchased and produced parts and take a record after put in crates, before shipping out we will do the final inspection and mock up the cabin and sling set, this part take photo and video as record to make customer being at ease.
Q4: What's the payment term?
A:30% in advance, 70% after customers inspection, before loading
Q5. What about the packaging?
A:All elevator parts will be packed into solid wooden cases. Some parts will be wrapped by the film so that guarantee the machinery part not be destroyed after long time transportation.
Q6. How to do with the elevator installation and maintenance?
A: We can send engineers to guide the installation and then train the workers about maintenance in the future. But in most situations, local workers can finish this work with our guidebooks and technology support, or you can ask the local professional elevator engineers to do this job, This can save much money for our customer. Of course, you can get support from our factory at any time.
Q7 . What's your guarantee time?
A:We can provide 18 months guarantee period, during this time, we will send free replacements to you. our service has no time limit.