Best Price Asia FUJI Vvvf Home Passenger Elevator Lift
Product Description
Asia FUJI Elevator uses the latest permanent magnet gearless to replace the traditional worm and worm traction machine, realizing the super miniaturization of the traction machine, thin, light weight, small volume, eliminating the mechanical loss between the gears, saving more than 60% energy compared with the previous elevator technology, reaching the environmental protection requirements of no oil, maintenance free, minimum noise, minimum vibration, and minimum machine room.
Parameters:
Capacity (Kg) |
Person |
Speed (m/s) |
Entrance(mm) |
Clear car dimension (mm) |
Caroutstide dimension (mm) |
Clear hoistway dimension (mm) |
Machine room dimension (mm) |
Pit depth (mm) |
Overhead Height (mm) |
Q |
NO. |
V |
OP |
CWXCD |
SWXSD |
HWXHD |
MWXMDXMH |
PD |
OH |
450 |
6 |
1.0 |
700 |
1200x1100 |
1252x1266 |
1800x1800 |
1800x1800x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
630 |
8 |
1.0 |
800 |
1400x1100 |
1452x1266 |
2000x1800 |
2000x1800x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
800 |
10 |
1.0 |
800 |
1400x1350 |
1452x1516 |
2000x2050 |
2000x2050x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
1.75 |
1700 |
4600 |
2.0 |
1800 |
4700 |
1000 |
13 |
1.0 |
900 |
1600x1450 |
1652x1616 |
2200x2200 |
2200x2200x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
1.75 |
1700 |
4600 |
2.0 |
1800 |
4700 |
2.5 |
2000 |
4900 |
4.0 |
3800 |
5900 |
1250 |
16 |
1.0 |
1000 |
1800x1550 |
1852x1716 |
2400x2300 |
2400x2300x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
1.75 |
1700 |
4600 |
2.0 |
1800 |
4700 |
2.5 |
2000 |
4900 |
4.0 |
3800 |
5900 |
1350 |
18 |
1.0 |
1100 |
1900x1600 |
1952x1766 |
2500x2300 |
2500x2300x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
1.75 |
1700 |
4600 |
2.0 |
1800 |
4700 |
2.5 |
2000 |
4900 |
4.0 |
3800 |
5900 |
1600 |
21 |
1.0 |
1200 |
2000x1700 |
2052x1866 |
2600x2400 |
2600x2400x2200 |
1500 |
4400 |
1.5 |
1600 |
4500 |
1.75 |
1700 |
4600 |
2.0 |
1800 |
4700 |
2.5 |
2000 |
4900 |
4.0 |
3800 |
5900 |
Machine details:
Placement machine; host production line; ABB Engineering, etc.advanced technology
Start with a board, make a door panel cut step by step, and then put it in the ABB Engineering. After completing the following operation process, the ABB robot and the line on the other side (shearing machine cutting plate → punching machine punching → bending → welding) works the same way
It is a safety protection device. When the elevator is powered off, the ARD will provide emergency power to the elevator control system, so that the elevator car can slowly run to the leveling position and open the door to release passengers
The latest permanent magnet gearless tractor was used to replace the traditional worm gear traction machine,which realizing the ultra small size,light weight of the traction machine, also eliminating the mechanical consumption between gears. It can save energy by more than 60% compared with the previous elevator technology, and meet the environmental protection requirements of minimum vibration, minimum machine room, no need for oil, maintenance-free with minimum noise.
Adopt NICE3000 new integrated control system. Using high-performance vector control technology and digital direct parking technology, the operation curve that is most suitable for human function is calculated according to the actual floor spacing
Optional:
Cabin,Landing Door,Ceiling and Floor.
Poduction Process:
The intelligent production line adopts ABB6700 series products, and adopts 360 rotation type, from feeding to bending, to enter the roll line turnover work, and at the same time, enters the stiffener, head, gluing and arc welding process. This production process is composed of a single direction private service control motor platform and a double head spot welding machine; it has high stability and efficiency, can achieve the best manufacturing accuracy
For our elevator high-end intelligent control system production is the core technology area of the whole project.This production line is SMT full-automatic production line, including printing, chip reflow welding, plug-in, test packaging, the main board of control system, external call board, car roof, etc., which are all produced by our company, few elevator manufacturers in China have;
Certification:
After decades of development, we have achieved many certifications to meet the safety standards of each country, such as SGS. ISSO. EAC ...etc
Cooperation Team/Participate in international exhibitions/Customer Visiting
Packing and Shipping:
01.Firstly use plastic film to wrap and cover the machine
02.Then pack small parts in plywood box
03.Marked with required label or shipping mark
04.Use steel wire rope to fix in the container,so as to avoid damage because of moving
Our Project:
For all our customers, most of them we can have a long term cooperation relationship. Such like for our domestic customers, most of them are introduced by our old customers. For example,in a foreign state, we already have a customer buy the elevators from us.
The other customers also want to import the elevatos, so he can inquire about which brand elevators from which factory. Now in China, we are a very famous brand already. If not, we can not sell so many elevators and escalators in domestic markets.
As you know in one Country, the information in the same industry is almost transparent. If our elevator and our service are not good,It is impossible for us to export almost 3000 units per year to all over the world.
Our Service:
(1)1 year maintenance service commitment
(2)Supply of spare parts
(3)Full installation support service
Careful assembly work
System packing method
Detailed packing list
Elevatorinstallationlist
Elevator repair and maintenance manual
Online assistance with installation
(4)Provision of manuals for lift installation and maintenance
Company Profile:
Asia Fuji Elevator(Linyi) Co., Ltd. is a joint-stock enterprise integrating R D, design, production, sales, installation and maintenance of all kinds of elevators. Located in Pingyi County, Linyi City, Shandong Province, it is a key construction project attracting investment in Linyi City in 2015, with a total area of 300 Mu and a total investment of 1.3 billion yuan. Products include passenger elevator, sightseeing elevator, household elevator, business elevator, medical elevator, villa elevator, cargo elevator, car elevator,escalator and sidewalk.
At present, the company has won the honors of "national quality inspection stable and qualified products", "national quality integrity excellent enterprise"and "high tech enterprise", and has won 11 technical patents in the elevator industry. In 2016, the company's leadership creatively positioned the company's development direction as"one-stop product service provider in the field of vertical transportation". marking Fuji Asia's official march into the field of three-dimensional garage, contributing to Asia's rich land strength in solving the "urban disease "of "parking difficulty".
FAQ:
Q1.Why choose us?
A1. Asia Fuji Elevator is a joint-stock enterprise integrating elevator R & D, design, production, sales, installation and maintenance.
Famous brand, already be confirmed by many customers
Domestic and overseas Sample projects are customers voice for our quality.
Q2: What advantages do you have?
A2:The intelligent production line adopts ABB6700 series products, and adopts 360 rotation type, from feeding to bending, to enter the roll line turnover work, and at the same time, enters the stiffener, head, gluing and arc welding process. These technology could guarantee the machine accuracy.
Q3. What information is absolutely needed before asking for price?
A3: 1. How many persons?
( 6 persons for 450kg,8 persons for 630kg, 10 persons for 800kg etc..)
2. How many floors/ stops/ doors?
3. What's the shaft size? (width by depth)
4. Is there a machine room on the top of shaft?
Q4. How can we guarantee the good quality of your products?
A4 In during the production process we will inspect all purchased and produced parts and take a record after put in crates, before shipping out we will do the final inspection and mockup the cabin and sling set, this part take photo and video as record to make customer being at ease.
Q5: WHAT'S THE PAYMENT TERM?
A5 30% in advance, 70% after customers inspection, before loading
Q6. What about the packaging?
A6: All elevator parts will be packed into solid wooden cases. Some parts will be wrapped by the film so that guarantee the machinery part not be destroyed after long time transportation.
Q7. How to do with the elevator installation and maintenance?
A7: We can send engineers to guide the installation and then train the workers about maintenance in the future. But in most situations, local workers can finish this work with our guidebooks and technology support, or you can ask the local professional elevator engineers to do this job, This can save much money for our customer. Of course, you can get support from our factory at any time.
Q8 . What's your guarantee time?
A8; We can provide 18months guarantee period, during this time, we will send free replacements to you. our service has no time limit.